Preliminary plot check
What happens
We check land designation, dimensions, access, terrain and available utilities using the cadastral code and photos.
What you receive
A preliminary conclusion on the plot's compatibility with ALAZANI 130.
From the plot check to the keys, the project follows one route. At every stage it is clear what is happening, what you receive and which document confirms it.
Construction takes 4 months; the countdown starts once the starting conditions are met (plot readiness, site access, approved specification, permitting conditions). The contract states the period in calendar days.
What happens
We check land designation, dimensions, access, terrain and available utilities using the cadastral code and photos.
What you receive
A preliminary conclusion on the plot's compatibility with ALAZANI 130.
What happens
A survey and soil investigation define the house placement and the foundation type.
What you receive
A topographic plan and a geology report.
What happens
The architect places the house on the plot: orientation, setbacks, entrance, terrace, utility points.
What you receive
A placement scheme for your plot.
What happens
We fix the completion level — BASE or BASE + FINISH, the selected modules and the full specification.
What you receive
A contract with a locked price and scope of works.
What happens
We prepare and submit the documents and manage the permit process.
What you receive
A building permit for the house.
What happens
Groundworks, reinforcement, concreting, the load-bearing frame. Concealed works are documented with photo reports.
What you receive
The completed structure of the house.
What happens
External walls, insulation, roof, windows, external doors, facade.
What you receive
A closed, warm envelope protected from the weather.
What happens
Electrics, plumbing, heating, air-conditioning preparation, partitions, plaster, screed.
What you receive
The house at BASE completion — ready for final finishes.
What happens
Finished surfaces, doors, sanitary ware, electrical fittings, lighting, the kitchen and appliances per specification.
What you receive
The house with final finishes and a ready kitchen.
What happens
The final checklist, system tests, cleaning, documentation handover.
What you receive
Keys, the warranty passport and the full document set.